AI buildout risk is the probability that planned data centres are delayed or never finished. It matters because it is the downstream sink where every upstream shock finally lands - a scarce transformer, a slipped optics roadmap, a stuck interconnection queue all show up here, as capacity that fails to arrive. What makes it dangerous now is correlation: the whole industry is building at once, drawing on the same narrow set of inputs, so the risks are not independent but move together.
If those correlated constraints bite, they do not stall one project - they stall a large share of planned capacity simultaneously, because everyone is bottlenecked on the same links. The exposure is broad and structural, touching developers and operators such as Crusoe, IREN and Quanta Services, and the power suppliers behind them - Vistra and Oklo - whose plans all assume the buildout actually completes.