Editorial read
In depth · editorial + model
Siting compute on the customer side of the meter at a dedicated generator (nuclear or gas), drawing power without a standard transmission interconnection. It is the main way frontier campuses can energize in 2-3 years instead of 5-plus, so its legal fate directly governs near-term AI capacity. FERC's rejection of the Talen-Amazon Susquehanna co-location amendment put a live regulatory ceiling on the model just as operators race to plug straight into nuclear and gas plants. Regulators block or claw back co-location rights over ratepayer cost-shift, stranding campuses that skipped the interconnection queue.